Furqon E. Muhammad JKT —:—
Capability Portfolio Edition MMXXVI Jakarta, Indonesia · 6.2°S Available for collaboration

Furqon EdyMuhammad

Superintendent — Project Improvement & Technology Solution across state-owned enterprise, EPC, mining and infrastructure. I turn operational data into decisions — KPI systems, business intelligence and improvement initiatives that move efficiency, productivity and margin.

Sectors
SOE · EPC · Mining · Infrastructure
Based
Jakarta, Indonesia
Status
Open to collaboration
Download ATS CV (PDF) ↗
00 — Profile Furqon Edy Muhammad
Furqon E. MuhammadS.T · M.Sc · DIC
10yrs
Delivery &
improvement
27+
Projects &
case studies
6
Core
disciplines
5
Awards &
nominations
Furqon Edy Muhammad — Capability PortfolioCover
01 / 09 Executive Summary

Profile & Agenda

01 / 09
Now
Superintendent — Project Improvement & Technology
Firm
PT. Petrosea Tbk — EPC & Infrastructure
Sectors
SOE · EPC · Mining · Infrastructure
Based
Jakarta, Indonesia

A corporate-performance and analytics professional who works where engineering meets the spreadsheet — building KPI monitoring, business intelligence and dashboards that make large projects legible, and leading the improvement initiatives that follow from what the data reveals.

Executive Summary01 / 09
02 / 09 Service Lines

Capabilities

02 / 09 · 06 disciplines
Corporate Performance & Analytics
01

Corporate Performance & Analytics

KPI frameworks, strategic reporting and performance reviews that connect operational reality to financial outcomes.

Business Intelligence & Dashboards
02

Business Intelligence & Dashboards

Dashboard development and data visualisation — turning fragmented project data into a single source of truth.

CFI BIDA Certified
Continuous Improvement
03

Continuous Improvement

Improvement and innovation management across EPC delivery — recognised at both Petrosea and Waskita innovation awards.

Feasibility & Construction PM
04

Feasibility & Construction PM

Feasibility design, cost control and construction project management for infrastructure and industrial development projects.

Financial Modelling & Valuation
05

Financial Modelling & Valuation

Cost–benefit analysis, value engineering and financial models for investment and improvement decisions.

CFI FMVA Certified
ESG & Sustainable Transport
06

ESG & Sustainable Transport

ESG coordination and emissions analysis — from policy briefs to circular-material innovation with measurable value.

Capabilities02 / 09
03 / 09 Tools & Platforms

Toolkit

03 / 09 · Platforms & software
Microsoft Power Automate
Microsoft Power BI
SQL
Microsoft Office 365
SAP Analytics Cloud
Python
R
Autodesk
Procore
Veerum
OpenPaths EMME
IBM SPSS
Petrosea Minerva
Gtrack

Analytics & BI · Project controls · Digital twin & field systems · Statistical & transport modelling

Toolkit03 / 09
04 / 09 Case Studies

Selected Engagements

04 / 09 · Delivery · Improvement · Research
No. 01 Technology & ICT

Vale Pomalaa — Technology Solution & ICT

PT. Petrosea Tbk2025 · SulawesiDigital Delivery

Led the technology and ICT delivery for the Vale Pomalaa EPC project — a private LTE network, fleet-management system, remote operations centre, Procore project controls, a Veerum digital twin and RFID asset tracking — building the digital backbone for site operations and reporting.

Private LTEFleet ManagementDigital TwinProcoreRFID
Read case study ↗
Industrial site technology
Vale Pomalaa — site technology & operations centre
No. 02 Continuous Improvement

Project Improvement — Existing EPC Portfolio

PT. Petrosea Tbk2025 · Multi-ProjectPerformance

Drove project-improvement and performance initiatives across the active EPC portfolio — Awakmas, UCC BP, Freeport Levee, Freeport K004 / K012B and Reko Diq in Pakistan — standardising controls, reporting and the processes that lift delivery efficiency and margin.

KPI MonitoringProcess StandardisationCost ControlReporting
Browse portfolio ↗
EPC infrastructure
EPC portfolio — improvement across active projects
No. 03 Transport Economics

Road-User Charging & Travel Behaviour

M.Sc Dissertation · ICLUK · 3 CitiesDiscrete Choice

Modelled how road-user charging reshapes travel behaviour across Glasgow, Bristol–Bath and Birmingham. Designed a stated-preference survey, estimated discrete-choice models and analysed sensitivity and elasticities against socio-economic segments.

Stated PreferenceDiscrete ChoiceElasticitiesData Viz
Read case study ↗
Urban transport research
Fieldwork — United Kingdom urban transport networks
No. 04 Circular Innovation

Waste-to-Structure Bridge

Petrosea Innovation Day4th Winner · 2023Circular Materials

Conceived and implemented the reuse of container and tyre waste as structural elements for bridges — converting site waste into engineered, sustainable value-add. Recognised as 4th Winner at Petrosea Innovation Day 2023.

Circular EconomyValue EngineeringImplementationSustainability
Read case study ↗
Innovation Day award
Petrosea Innovation Day — project team
Further engagements — 2016 → 2026
YearEngagementScope
2026Head-Office EPC Digital PlatformTender register, WBS standardisation and change-order automation for the EPC head office.
2026Subsidiaries Improvement — HBS, Papua New GuineaPerformance and process improvement across Petrosea subsidiaries in PNG.
2026Awakmas — Operational ExcellenceOperational-excellence and continuous-improvement programme on the Awakmas (Masmindo Dwi Area) project.
2025Vale Project — Technology Solution LeadTechnology & ICT solution lead for implementation on the Vale Pomalaa site — networks, fleet systems and digital twin.
2025Water Treatment Plant — FeasibilityFeasibility study for the water treatment plant (Chandra Daya Investasi).
2024Road User Charging — 3 Cities ResearchStated-preference and discrete-choice research on road-user charging across Glasgow, Bristol–Bath and Birmingham.
2024Heathrow Surface-Access AppraisalDemand modelling and multi-criteria / cost–benefit appraisal of non-private access to Heathrow, with Arup.
2024Aviation GHG Policy BriefGreenhouse-gas accounting, forecasting and mitigation analysis for DHL Express Air.
2022Research & Innovation — Waskita KaryaMarket intelligence, lean construction and modular-construction initiatives.
2021Covid Hospital — Cost Control & Risk ManagementCost control and risk management for emergency hospital delivery, Batam and RSCM.
2017LRT South SumateraEngineering support and cost control on the South Sumatera light-rail project.
2016Gaia Hotel — PM ReportingProject-management reporting for the Gaia Hotel development, Bandung (Nusa Konstruksi Enjiniring).
2016Lecturer Assistant — ITBTeaching assistant in Pavement Engineering and Engineering Mathematics.
View all 27 case studies ↗EPC · Mining · BD · Digital · Research
Selected Engagements04 / 09
04B Portfolio at a Glance

All 27 Works by Tag

27 case studies · auto-scroll
Power BIData PipelineDAXCompetitor BenchmarkingMarket SizingQA/QCRFI TrackingAutomationComplianceEWHFuel AnalysisProductivityOpExProcurementRecovery PlanBlockersProject ControlsEarned ValueS-CurveCPI/SPIBOD ReportingWin Probability
01INAPROC Market Intelligence & Competitor Benchmarking Platform
Power BI
INAPROC Market Intelligence & Competitor Benchmarkin
02C3RR Freeport Project Quality Verification Dashboard
Power BI
C3RR Freeport Project Quality Verification Dashboard
03Awakmas Mine Operational Excellence & Productivity Dashboard
Power BI
Awakmas Mine Operational Excellence & Productivity D
04Awakmas Mine Procurement & Strategic Recovery Dashboard
Power BI
Awakmas Mine Procurement & Strategic Recovery Dashbo
05Reko Diq Project Control & Executive Reporting Dashboard
Power BI
Reko Diq Project Control & Executive Reporting Dashb
06Go Get Analysis & Client Engagement Platform
Power BI
Go Get Analysis & Client Engagement Platform
07Business Development Tender Summary & Pipeline Command Center
Power BI
Business Development Tender Summary & Pipeline Comma
08HBS Papua New Guinea Post-Acquisition Fleet Performance Dashboard
Power BI
HBS Papua New Guinea Post-Acquisition Fleet Performa
09HBS Fleet Performance & Profitability Command Center
Power BI
HBS Fleet Performance & Profitability Command Center
10Vale Pomalaa Project Control & Operational Intelligence Suite
Power BI
Vale Pomalaa Project Control & Operational Intellige
11Multi-Project Procore KickStart Implementation
Procore
Multi-Project Procore KickStart Implementation
12BP UCC Early Works Marine Fleet Management & Fuel Dashboard
Power BI
BP UCC Early Works Marine Fleet Management & Fuel Da
13UCC BP Early Works Material Control & Supply Chain Intelligence Suite
Power BI
UCC BP Early Works Material Control & Supply Chain I
14Levee Project Daily Production & Revenue Rate Dashboard
Power BI
Levee Project Daily Production & Revenue Rate Dashbo
15EPC Digital Roadmap & Technology Strategy Formulation
Digital Roadmap
EPC Digital Roadmap & Technology Strategy Formulatio
16Custom Petrosea Digital Twin Integration (Veerum Platform)
Digital Twin
Custom Petrosea Digital Twin Integration (Veerum Pla
17Vale Pomalaa GPS Tracking & Fleet Management System (FMS) Safety Suite
Power BI
Vale Pomalaa GPS Tracking & Fleet Management System
19IKN Strategic Cluster Analysis & Power BI Intelligence Platform
Power BI
IKN Strategic Cluster Analysis & Power BI Intelligen
20Lean Construction Last Planner System (LPS) Implementation
Lean Construction
Lean Construction Last Planner System (LPS) Implemen
21Waskita Research & Innovation Requirement Analysis & Strategic TOWS Matrix
R&D Strategy
Waskita Research & Innovation Requirement Analysis &
22Waskita Customer Satisfaction Market Research & Vendor Performance Analytics
Market Research
Waskita Customer Satisfaction Market Research & Vend
23West Kalimantan Toll Road Pre-Feasibility Study
Transport Engineering
West Kalimantan Toll Road Pre-Feasibility Study
24Detailed Engineering Design (DED) Support & Highway Alignment Modeling
Autodesk Civil 3D
Detailed Engineering Design (DED) Support & Highway
25Master’s Dissertation: Travel Behavior & Stated Preference Impacts of Road User Charging
Discrete Choice
Master’s Dissertation: Travel Behavior & Stated Pref
26Heathrow Surface Access Demand Generation & Non-Private Transport Assessment
Surface Access
Heathrow Surface Access Demand Generation & Non-Priv
27DHL Express Air Corporate Aviation GHG Emissions Strategy
GHG Accounting
DHL Express Air Corporate Aviation GHG Emissions Str
28Reusing Containers for Bridge Infrastructure Design (NHM Project)
Value Engineering
Reusing Containers for Bridge Infrastructure Design
01INAPROC Market Intelligence & Competitor Benchmarking Platform
Power BI
INAPROC Market Intelligence & Competitor Benchmarkin
02C3RR Freeport Project Quality Verification Dashboard
Power BI
C3RR Freeport Project Quality Verification Dashboard
03Awakmas Mine Operational Excellence & Productivity Dashboard
Power BI
Awakmas Mine Operational Excellence & Productivity D
04Awakmas Mine Procurement & Strategic Recovery Dashboard
Power BI
Awakmas Mine Procurement & Strategic Recovery Dashbo
05Reko Diq Project Control & Executive Reporting Dashboard
Power BI
Reko Diq Project Control & Executive Reporting Dashb
06Go Get Analysis & Client Engagement Platform
Power BI
Go Get Analysis & Client Engagement Platform
07Business Development Tender Summary & Pipeline Command Center
Power BI
Business Development Tender Summary & Pipeline Comma
08HBS Papua New Guinea Post-Acquisition Fleet Performance Dashboard
Power BI
HBS Papua New Guinea Post-Acquisition Fleet Performa
09HBS Fleet Performance & Profitability Command Center
Power BI
HBS Fleet Performance & Profitability Command Center
10Vale Pomalaa Project Control & Operational Intelligence Suite
Power BI
Vale Pomalaa Project Control & Operational Intellige
11Multi-Project Procore KickStart Implementation
Procore
Multi-Project Procore KickStart Implementation
12BP UCC Early Works Marine Fleet Management & Fuel Dashboard
Power BI
BP UCC Early Works Marine Fleet Management & Fuel Da
13UCC BP Early Works Material Control & Supply Chain Intelligence Suite
Power BI
UCC BP Early Works Material Control & Supply Chain I
14Levee Project Daily Production & Revenue Rate Dashboard
Power BI
Levee Project Daily Production & Revenue Rate Dashbo
15EPC Digital Roadmap & Technology Strategy Formulation
Digital Roadmap
EPC Digital Roadmap & Technology Strategy Formulatio
16Custom Petrosea Digital Twin Integration (Veerum Platform)
Digital Twin
Custom Petrosea Digital Twin Integration (Veerum Pla
17Vale Pomalaa GPS Tracking & Fleet Management System (FMS) Safety Suite
Power BI
Vale Pomalaa GPS Tracking & Fleet Management System
19IKN Strategic Cluster Analysis & Power BI Intelligence Platform
Power BI
IKN Strategic Cluster Analysis & Power BI Intelligen
20Lean Construction Last Planner System (LPS) Implementation
Lean Construction
Lean Construction Last Planner System (LPS) Implemen
21Waskita Research & Innovation Requirement Analysis & Strategic TOWS Matrix
R&D Strategy
Waskita Research & Innovation Requirement Analysis &
22Waskita Customer Satisfaction Market Research & Vendor Performance Analytics
Market Research
Waskita Customer Satisfaction Market Research & Vend
23West Kalimantan Toll Road Pre-Feasibility Study
Transport Engineering
West Kalimantan Toll Road Pre-Feasibility Study
24Detailed Engineering Design (DED) Support & Highway Alignment Modeling
Autodesk Civil 3D
Detailed Engineering Design (DED) Support & Highway
25Master’s Dissertation: Travel Behavior & Stated Preference Impacts of Road User Charging
Discrete Choice
Master’s Dissertation: Travel Behavior & Stated Pref
26Heathrow Surface Access Demand Generation & Non-Private Transport Assessment
Surface Access
Heathrow Surface Access Demand Generation & Non-Priv
27DHL Express Air Corporate Aviation GHG Emissions Strategy
GHG Accounting
DHL Express Air Corporate Aviation GHG Emissions Str
28Reusing Containers for Bridge Infrastructure Design (NHM Project)
Value Engineering
Reusing Containers for Bridge Infrastructure Design
28Reusing Containers for Bridge Infrastructure Design (NHM Project)
Value Engineering
Reusing Containers for Bridge Infrastructure Design
27DHL Express Air Corporate Aviation GHG Emissions Strategy
GHG Accounting
DHL Express Air Corporate Aviation GHG Emissions Str
26Heathrow Surface Access Demand Generation & Non-Private Transport Assessment
Surface Access
Heathrow Surface Access Demand Generation & Non-Priv
25Master’s Dissertation: Travel Behavior & Stated Preference Impacts of Road User Charging
Discrete Choice
Master’s Dissertation: Travel Behavior & Stated Pref
24Detailed Engineering Design (DED) Support & Highway Alignment Modeling
Autodesk Civil 3D
Detailed Engineering Design (DED) Support & Highway
23West Kalimantan Toll Road Pre-Feasibility Study
Transport Engineering
West Kalimantan Toll Road Pre-Feasibility Study
22Waskita Customer Satisfaction Market Research & Vendor Performance Analytics
Market Research
Waskita Customer Satisfaction Market Research & Vend
21Waskita Research & Innovation Requirement Analysis & Strategic TOWS Matrix
R&D Strategy
Waskita Research & Innovation Requirement Analysis &
20Lean Construction Last Planner System (LPS) Implementation
Lean Construction
Lean Construction Last Planner System (LPS) Implemen
19IKN Strategic Cluster Analysis & Power BI Intelligence Platform
Power BI
IKN Strategic Cluster Analysis & Power BI Intelligen
17Vale Pomalaa GPS Tracking & Fleet Management System (FMS) Safety Suite
Power BI
Vale Pomalaa GPS Tracking & Fleet Management System
16Custom Petrosea Digital Twin Integration (Veerum Platform)
Digital Twin
Custom Petrosea Digital Twin Integration (Veerum Pla
15EPC Digital Roadmap & Technology Strategy Formulation
Digital Roadmap
EPC Digital Roadmap & Technology Strategy Formulatio
14Levee Project Daily Production & Revenue Rate Dashboard
Power BI
Levee Project Daily Production & Revenue Rate Dashbo
13UCC BP Early Works Material Control & Supply Chain Intelligence Suite
Power BI
UCC BP Early Works Material Control & Supply Chain I
12BP UCC Early Works Marine Fleet Management & Fuel Dashboard
Power BI
BP UCC Early Works Marine Fleet Management & Fuel Da
11Multi-Project Procore KickStart Implementation
Procore
Multi-Project Procore KickStart Implementation
10Vale Pomalaa Project Control & Operational Intelligence Suite
Power BI
Vale Pomalaa Project Control & Operational Intellige
09HBS Fleet Performance & Profitability Command Center
Power BI
HBS Fleet Performance & Profitability Command Center
08HBS Papua New Guinea Post-Acquisition Fleet Performance Dashboard
Power BI
HBS Papua New Guinea Post-Acquisition Fleet Performa
07Business Development Tender Summary & Pipeline Command Center
Power BI
Business Development Tender Summary & Pipeline Comma
06Go Get Analysis & Client Engagement Platform
Power BI
Go Get Analysis & Client Engagement Platform
05Reko Diq Project Control & Executive Reporting Dashboard
Power BI
Reko Diq Project Control & Executive Reporting Dashb
04Awakmas Mine Procurement & Strategic Recovery Dashboard
Power BI
Awakmas Mine Procurement & Strategic Recovery Dashbo
03Awakmas Mine Operational Excellence & Productivity Dashboard
Power BI
Awakmas Mine Operational Excellence & Productivity D
02C3RR Freeport Project Quality Verification Dashboard
Power BI
C3RR Freeport Project Quality Verification Dashboard
01INAPROC Market Intelligence & Competitor Benchmarking Platform
Power BI
INAPROC Market Intelligence & Competitor Benchmarkin
28Reusing Containers for Bridge Infrastructure Design (NHM Project)
Value Engineering
Reusing Containers for Bridge Infrastructure Design
27DHL Express Air Corporate Aviation GHG Emissions Strategy
GHG Accounting
DHL Express Air Corporate Aviation GHG Emissions Str
26Heathrow Surface Access Demand Generation & Non-Private Transport Assessment
Surface Access
Heathrow Surface Access Demand Generation & Non-Priv
25Master’s Dissertation: Travel Behavior & Stated Preference Impacts of Road User Charging
Discrete Choice
Master’s Dissertation: Travel Behavior & Stated Pref
24Detailed Engineering Design (DED) Support & Highway Alignment Modeling
Autodesk Civil 3D
Detailed Engineering Design (DED) Support & Highway
23West Kalimantan Toll Road Pre-Feasibility Study
Transport Engineering
West Kalimantan Toll Road Pre-Feasibility Study
22Waskita Customer Satisfaction Market Research & Vendor Performance Analytics
Market Research
Waskita Customer Satisfaction Market Research & Vend
21Waskita Research & Innovation Requirement Analysis & Strategic TOWS Matrix
R&D Strategy
Waskita Research & Innovation Requirement Analysis &
20Lean Construction Last Planner System (LPS) Implementation
Lean Construction
Lean Construction Last Planner System (LPS) Implemen
19IKN Strategic Cluster Analysis & Power BI Intelligence Platform
Power BI
IKN Strategic Cluster Analysis & Power BI Intelligen
17Vale Pomalaa GPS Tracking & Fleet Management System (FMS) Safety Suite
Power BI
Vale Pomalaa GPS Tracking & Fleet Management System
16Custom Petrosea Digital Twin Integration (Veerum Platform)
Digital Twin
Custom Petrosea Digital Twin Integration (Veerum Pla
15EPC Digital Roadmap & Technology Strategy Formulation
Digital Roadmap
EPC Digital Roadmap & Technology Strategy Formulatio
14Levee Project Daily Production & Revenue Rate Dashboard
Power BI
Levee Project Daily Production & Revenue Rate Dashbo
13UCC BP Early Works Material Control & Supply Chain Intelligence Suite
Power BI
UCC BP Early Works Material Control & Supply Chain I
12BP UCC Early Works Marine Fleet Management & Fuel Dashboard
Power BI
BP UCC Early Works Marine Fleet Management & Fuel Da
11Multi-Project Procore KickStart Implementation
Procore
Multi-Project Procore KickStart Implementation
10Vale Pomalaa Project Control & Operational Intelligence Suite
Power BI
Vale Pomalaa Project Control & Operational Intellige
09HBS Fleet Performance & Profitability Command Center
Power BI
HBS Fleet Performance & Profitability Command Center
08HBS Papua New Guinea Post-Acquisition Fleet Performance Dashboard
Power BI
HBS Papua New Guinea Post-Acquisition Fleet Performa
07Business Development Tender Summary & Pipeline Command Center
Power BI
Business Development Tender Summary & Pipeline Comma
06Go Get Analysis & Client Engagement Platform
Power BI
Go Get Analysis & Client Engagement Platform
05Reko Diq Project Control & Executive Reporting Dashboard
Power BI
Reko Diq Project Control & Executive Reporting Dashb
04Awakmas Mine Procurement & Strategic Recovery Dashboard
Power BI
Awakmas Mine Procurement & Strategic Recovery Dashbo
03Awakmas Mine Operational Excellence & Productivity Dashboard
Power BI
Awakmas Mine Operational Excellence & Productivity D
02C3RR Freeport Project Quality Verification Dashboard
Power BI
C3RR Freeport Project Quality Verification Dashboard
01INAPROC Market Intelligence & Competitor Benchmarking Platform
Power BI
INAPROC Market Intelligence & Competitor Benchmarkin

All 27 projects · hover to pause · click any card to open the full case study ↗

All Works by Tag27 projects
05 / 09 Awards & Innovation

Recognition

05 / 09
Certificate of appreciation
Petrosea · Innovation Day 2023

4th Winner — Circular-Material Bridge Innovation

Recognised among Petrosea's top innovators for turning container and tyre waste into structural, value-adding bridge components.

→ 2023 · EPC Division
Award ceremony
Waskita Awards 2021

1st Winner — Best Creative Ideas, Social Innovation

First place for a social-innovation concept at the Waskita Karya innovation awards.

→ 2021 · Social Innovation
Waskita · 2022
2nd Winner — Digital Integration

Product-innovation award for the Waskita Integrated Price Database.

Waskita · 2022
Nominee — Market Intelligence

Production-innovation nominee for automated tender-data intelligence drawn from 46 state institutions.

Kementerian Pariwisata · 2017
2nd Winner — Branding & Logo Design

National tourism branding competition for North Kalimantan (Kalimantan Utara).

Recognition05 / 09
06 / 09 Service & Leadership

NGO & Community

06 / 09

Mata Garuda Britania & Irlandia

Deputy Head of Dept.

Leadership within the LPDP scholar alumni network across Britain and Ireland.

2024

Think Policy

Alumni

Alumnus of the public-policy and systems-thinking learning community.

2022

Institut Harkat Negeri

Alumni · Leadership B3

Graduate of the Leadership Class, Batch 3.

2022

Indonesia Infrastructure Research & Innovation

Company Representative

Represented the company in national infrastructure research and innovation forums.

2022

Syamsi Dhuha Foundation

Volunteer

Volunteer supporting the foundation's health and community programmes.

2017

Himpunan Mahasiswa Sipil — ITB

Head of External Relations

Led external relations for the ITB Civil Engineering student association.

2016

Sibades — Sipil Bangun Desa

Volunteer

Volunteer on civil-engineering village development and community-building projects.

2015

Apres! — ITB

Staff · Insight Division

Supported the Insight Division of the ITB student appreciation programme.

2013
NGO & Community06 / 09
07 / 09 A Personal Register

Writing

07 / 09

Alongside the work, I keep a personal writing practice — short reflections on working, slowing down and growing, published as themed series.

@yoursupportingcharacter ↗
SERIES 01

Slow

Notes on slowing down and paying attention.

19 entries
SERIES 02

Book

Reading notes and takeaways.

13 entries
SERIES 03

Imperial

A year studying in London.

10 entries
SERIES 04

Overwork

On work, ambition and burnout.

9 entries
SERIES 05

Cities

Field notes on cities and movement.

7 entries
SERIES 06

Level Up

On growth and self-improvement.

5 entries
SERIES 07

Rewrite

On revising the story you tell yourself.

3 entries
Writing07 / 09
08 / 09 Education & Certification

Credentials

08 / 09
Education
M.Sc (DIC)Imperial College London

Transport & Civil Engineering — discrete-choice modelling, appraisal and sustainable transport. Diploma of Imperial College, with Distinction.

S.TInstitut Teknologi Bandung

Civil Engineering, with Distinction — foundation in infrastructure delivery and engineering analysis.

Certification
BIDACFI · 2022
FMVACFI · 2022
ESG SpecializationCFI · 2022
Construction ManagementColumbia · 2021
Modern-Day BusinessBCG · 2021
Ahli Manajemen ProyekASTEKINDO · 2019
State-Owned EnterpriseEPCMiningInfrastructureESG
Credentials08 / 09
09 / 09 — Get in touch

Let's build
something worth
measuring.

furqonmuhammad@hotmail.com ↗
Based
Jakarta, Indonesia
Role
Superintendent — Project Improvement & Technology
WhatsApp
Local time
—:—
Writing